The creation of or conversion to new dwellings
Creation of New Dwellings:
Number of Dwellings/ Types | Full Plans Charge (£) |
---|---|
1 | 728 |
2 | 998 |
3 | 1261 |
4 | 1586 |
5 | 1950 |
Creation of New Dwellings by Conversion:
Number of Dwellings/ Types | Full Plans Charge(£) | Building Notice Charge(£) |
---|---|---|
1 | 728 | 874 |
2 | 998 | 1185 |
3 | 1261 | 1513 |
4 | 1586 | 1903 |
5 | 1950 | 2340 |
Note: For six or more dwellings, or if the floor area of a dwelling exceeds 300m², or the building has more than three storeys, the charge is individually determined (a basement is classed as a storey for these purposes).
This table presumes that controlled electrical installations are being designed, installed, tested and certified by a part P registered electrician. If this is not the case an additional charge may be payable in accordance with table C category 5. Standard charges for other domestic building work.